Maintenance work order: what it is, fields and life cycle

By the Mantenplan team · Published on · Updated on

In short
  • A work order (WO) is the record of an intervention: what is done, where, by whom, when, for how long and with what material.
  • A typical life cycle: open → assigned → in progress → completed → closed.
  • The easier it is to close from the phone, the better data you will have.

A maintenance work order (WO) is the document, today usually digital, that records an intervention on an asset: what has to be done, where, who does it, when, how much time is spent and what material is consumed. It is the basic unit of maintenance: each machine’s history, the costs and the indicators come from work orders.

Where does a WO come from?

Essential fields

FieldWhat it is for
Title and descriptionExplain the problem or the task clearly.
Asset and locationLink the intervention to the machine’s history.
Type and priorityDistinguish corrective, preventive and inspection; order the urgency.
AssigneeKnow who has to do it.
DatesPlanned date, actual start and closure.
Tasks or checklistSpecific steps to check.
Time recordedActual hours to calculate costs and workloads.
Material consumedSpare parts deducted from stock and cost of materials.
Photos and commentsEvidence and context of what happened.

Life cycle of a WO

  1. Open: created, waiting to be assigned.
  2. Assigned: it has an assignee.
  3. In progress: the technician has started.
  4. On hold: stopped for lack of a spare part, access or authorisation.
  5. Completed: the technician has finished and recorded what was done.
  6. Closed: reviewed and validated; it is no longer modified.

It can also be cancelled if it is no longer needed. Transitions should be controlled: a closed WO should not be reopenable without leaving a trace.

Good practices

What if there is no coverage?

In many installations the technician works offline. A good tool should let you check the day’s work orders and record time, comments and consumption offline, and then sync without losing data.

Work orders that work without coverage

In Mantenplan technicians see their work orders for the day and record time, comments, readings and consumption offline; everything syncs when coverage returns.

Try Mantenplan

Frequently asked questions

What is the difference between a work order and a work request?

The request is the petition for something to be done, usually from a user. The work order is the decision to carry it out, with an assignee, deadlines and resources assigned.

Who should close the work order?

The technician completes it when finished and a manager (supervisor) validates and closes it, so that the review is on record.